Description
The 44,000 square foot, two-story wood-framed independent living facility, made up of thirty, one and two bedroom, units ranging from 800-1,300 square feet. The second building is a 13,000 square foot, two-story CMU and steel framed vitality center. The first floor is home to a heated indoor-exercise pool, therapy pool, fitness center, juice bar and massage room. The second floor includes a 185-seat multi-purpose space which will serve as a Synagogue, theater and performing arts venue. Other features of the project include a significant upgrade to the existing central plant (OSHPD project), integration of nurse call and paging systems throughout both buildings, two new outdoor patio spaces containing a fireplace, fire pit, fountain, shuffleboard court and BBQ.
Added Value
In hiring Hughes Marino, Seacrest Village was able to eliminate the need for a full time on-site project management staff, reducing their cost to the project by over 70%.
Service Provided
Hughes Marino provided construction management services from final plan review, bidding, Value Engineering, bidding and selection of the general contractor thru construction and occupancy of the new facility.
Project Details
Square Feet - 58,000 SF
Contract Amount - $13.2 million
General Contractor - Bycor General Contractors
Architect - SGPA Architecture and Planning
Project Categories
Industry - Nonprofit
Amenities - Dining Area, Kitchen, Outdoor Space
Project Type - Ground-Up Construction