{"id":32978,"date":"2026-11-18T12:45:48","date_gmt":"2026-11-18T20:45:48","guid":{"rendered":"https:\/\/hughesmarino.com\/orange-county\/?p=32978"},"modified":"2026-11-18T12:46:36","modified_gmt":"2026-11-18T20:46:36","slug":"the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease","status":"publish","type":"post","link":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/","title":{"rendered":"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>By Alex Musetti, Will Tober and Mike Paleo<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finding a compatible industrial space has always been complex. But for manufacturers today, the challenge runs deeper than square footage and location. This is, in part, due to the decades-long trend of sending U.S. manufacturing facilities abroad. The result of that trend was that the U.S. no longer needed to build manufacturing facilities but distribution facilities instead. The product was no longer being made here, but it still needed to be stored and distributed from here. With that, the majority of available industrial buildings across much of the United States today were built with distribution, not manufacturing, in mind. Racks, forklifts, dock doors and flat floors. Clean, simple, predictable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Manufacturers have different needs. Additional power, different ventilation, heavier floors, specific column spacing, cranes, gas lines, and parking for larger workforces, to name a few. Increasingly, technology infrastructure is at the top of that list, as well.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The gap between what is available and what manufacturers actually need is one of the most underappreciated challenges in industrial real estate today. We recently spoke with Bryan Burns, Vice President at <a href=\"https:\/\/exclusive-ca.com\/service-details\/warehouse-power\">Exclusive Warehouse Solutions<\/a>, a firm specializing in industrial facility solutions for manufacturing operations. Bryan walked us through the most common challenges manufacturers face, what to watch for and what manufacturers should be thinking about before they sign a lease. The Hughes Marino industrial team weighs in on the real estate advisory side of the conversation below.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Built for Distribution, Not Manufacturing<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Q: Most industrial buildings were built with distribution in mind. How does that create challenges for manufacturers looking for space?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Bryan Burns:<\/strong> It&#8217;s one of the most consistent friction points we see. The speculative construction that drives most of the industrial supply in many markets, such as Southern California, is optimized for distribution: high clear heights, lots of dock doors, wide column spacing for racking and basic electrical service. That works beautifully if you&#8217;re moving product through a building. It doesn&#8217;t work as well if you&#8217;re making something in it. Manufacturers need power, gas, ventilation, specific floor specs and sometimes crane systems. Most of the available supply simply wasn&#8217;t designed with any of that in mind, and retrofitting a building to meet those needs can be expensive, time-consuming and in some cases not even possible within the constraints of a lease.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Manufacturers Need to Know<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Q: What are the most common building-related <\/strong>issues<strong> you run into when helping manufacturers find space?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Bryan Burns:<\/strong> Power is probably the single biggest one right now. Most distribution buildings don&#8217;t have the electrical infrastructure that modern manufacturing operations require. We&#8217;re talking about switchgear capacity and transformer supply from the utility. We recently worked with a client that needed to add high-capacity EV chargers for electric semi-trucks. The building they acquired didn&#8217;t have the electrical capacity to support it. We could get the internal gear upgraded in six to seven months, but the utility company&#8217;s timeline for a new transformer was close to two years. While that client had some flexibility because the trucks weren&#8217;t mission-critical yet, most manufacturers don&#8217;t have that luxury. Their machinery is the main income generator, and without adequate power, they simply can&#8217;t operate. We&#8217;ve seen similar situations with pharmaceutical clients who ended up having to install a full-time natural gas generator at significant cost just to keep new machinery running while waiting on an electrical grid upgrade. That&#8217;s an expensive interim solution on top of an already expensive permanent one.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"775\" height=\"480\" src=\"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-article-image.jpg\" alt=\"hidden challenges of manufacturing space article image\" class=\"wp-image-32981\" srcset=\"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-article-image.jpg 775w, https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-article-image-300x186.jpg 300w, https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-article-image-768x476.jpg 768w\" sizes=\"(max-width: 775px) 100vw, 775px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">And this isn&#8217;t a niche problem. The range of industries now requiring serious electrical capacity is broader than most people realize: semiconductor and electronics producers, EV and battery manufacturers, aerospace and defense contractors, medical device and life science companies, robotics firms, cold storage operators, food processors and precision fabricators are all asking the same question before they look at anything else: can this building support our power load today, and can it grow with us?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Q: Beyond power, what else tends to catch manufacturers off guard?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Bryan Burns:<\/strong> Column spacing is a big one that doesn&#8217;t get enough attention. Standard warehouses are designed so that columns can be hidden behind back-to-back rack systems, which works great for distribution. Manufacturers often need to work around large machines and crane systems, and a column in the wrong place can fundamentally disrupt a production floor layout. Related to that is the question of crane systems. A meaningful number of manufacturers need overhead cranes, but many of the buildings constructed during the speculative building boom from the late 1990s through the mid-2000s have roof systems that simply can&#8217;t support a standard overhead crane. We&#8217;ve seen clients have to fall back on gantry crane systems instead, which take up valuable floor space because of the track footprint they require. Then there&#8217;s concrete. Floor quality matters enormously for manufacturers, and it&#8217;s often a problem in older buildings. Most standard warehouses were built with slabs five to six inches thick at 3,500 to 4,000 PSI. General manufacturing typically requires at least six inches at 4,000 PSI, operations involving CNC machining or fabrication equipment often need six to eight inches at 4,000 PSI or higher, and heavy manufacturing can require eight inches or more, sometimes with engineered foundations entirely. We&#8217;ve seen situations where the concrete in an available building lacked adequate rebar support, meaning a rack system that was already in place couldn&#8217;t be permitted for a new tenant without triggering a red tag on the building. That&#8217;s a serious problem that effectively renders a building unusable for certain operations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Q: Are there other infrastructure issues specific to manufacturing that don&#8217;t apply to distribution?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Bryan Burns:<\/strong> Several. Gas supply is one that surprises people. Most distribution buildings don&#8217;t have adequate gas infrastructure to support welding, ovens or boilers, all of which are common in manufacturing. Ventilation is another. Distribution centers are generally just moving product through, so air quality and airflow aren&#8217;t a major concern. Manufacturing is a different story. We worked with a client that was boiling product as part of their process, and the fumes and heat were creating serious conditions for their employees.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Parking is also a significant consideration that often gets overlooked. A 150,000 SF distribution operation might run with 45 total employees and need around 48 parking spaces. That same 150,000 SF facility converted to a manufacturing operation could have 200 or more employees and need 300 parking spaces. Most buildings that were designed for distribution simply don&#8217;t have the parking footprint to support that. And finally, zoning. Not every city will permit every type of manufacturing within their boundaries, and we&#8217;ve seen companies sign leases before confirming their intended use is allowed, which creates real legal and financial exposure.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Q: As robotics and automation become more prominent in manufacturing, are building specifications becoming even more important?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Bryan Burns:<\/strong> Absolutely, and floor quality is a good example of this. It&#8217;s always mattered, but as robotic systems enter manufacturing facilities the stakes are higher. These systems need very precise, level surfaces not only for travel but for autonomous charging to work correctly. In older buildings, floor resurfacing, leveling and smoothing out pathways and charging areas is often required before a robotic system can even be deployed. The electrical requirements are compounding this too. Automated systems draw substantially more power than conventional operations. A building that was marginal on electrical capacity for a traditional manufacturing setup may be completely inadequate once you factor in robotics. The building envelope is becoming as much a technology decision as it is a real estate decision, and most tenants don&#8217;t realize that until they&#8217;re already committed to a space.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Space Factors into the Manufacturing Decision<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Q: How does advising a manufacturing client on space differ from advising a distribution client?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Hughes Marino:<\/strong> Manufacturing tenants can&#8217;t shop for space the way distribution tenants do. A distribution deal is largely about location, box dimensions, clear height, sprinklers and dock door count. The building itself does most of the work. Manufacturing is different because the building has to support people and a process, not just inert product. That means a much deeper upfront assessment before the search even begins: available parking or yard space for employees, power capacity and utility service for equipment, floor slab thickness and load ratings, ceiling height and column spacing for process flow, and environmental or life-safety requirements tied to the specific operation, not to mention zoning and city approval considerations. Those variables don&#8217;t show up on a distribution requirements sheet, but they can eliminate a building outright for a manufacturer.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On top of that, the supply itself works against manufacturing tenants. Most speculative industrial construction over the last decade was built distribution-first, big boxes optimized for pallets and trucks, not process equipment, so manufacturing-ready buildings, or ones that can realistically be converted, are a much smaller and more competitive slice of the market. The result is that manufacturing clients need to define their operational must-haves before touring anything, because that list narrows the available options far more than most tenants expect.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Q: When a manufacturing client comes to you with a space requirement, what do you need to understand before you start searching?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Hughes Marino:<\/strong> Before we start any search, we run a thorough needs assessment to fully understand the client&#8217;s business and operation, not just their stated space and budget parameters. That means digging into how the process actually works: what equipment is involved, how power-hungry it is, what the workflow looks like from raw material to finished product, how many shifts they run and whether there are any byproducts, such as heat, noise, emissions or wastewater, that need to be managed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What&#8217;s interesting is that this process almost always surfaces requirements the client hadn&#8217;t thought to mention or didn&#8217;t realize would affect their real estate search. A client might not think to tell us about a piece of equipment they&#8217;re planning to add in two years, or that their process needs three-phase power at a specific voltage, or that a certain manufacturing step requires makeup air or specialized ventilation. Those details can eliminate buildings that otherwise look perfect on paper, so the earlier we uncover them, the less time we waste touring space that was never going to work.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Q: What do you want manufacturing companies to know before they start their real estate search?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Hughes Marino:<\/strong>Building selection for a manufacturer is an operational decision as much as it&#8217;s a real estate decision. It&#8217;s easy to focus on rate per square foot and location, but the wrong building\u2014one without adequate power, floor loading or ceiling height for your process\u2014can end up costing far more than any rent savings you thought you were getting. Retrofitting power infrastructure, reinforcing a slab or adding ventilation after the fact can run into the hundreds of thousands of dollars and, worse yet, create six to 24 months of downtime exposure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our advice: build a team of experts around this decision from day one, your real estate advisor, your engineers, plant managers, an architect or mechanical, electrical and plumbing (MEP) consultant who understands industrial process requirements and ideally a construction project manager who can weigh in on costs, timeline and what a space would actually take to retrofit. Manufacturing real estate decisions touch too many disciplines for any one person to catch everything alone. The companies that get this right treat the search as a team exercise from the start, not a real estate transaction that gets handed off to operations after the lease is signed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Q: How is the growing demand for power-intensive operations changing the way you evaluate industrial buildings for manufacturing clients?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Hughes Marino:<\/strong> Power has quietly become the first filter, not the last. Tenants used to tour a building, like the layout and ask about power near the end, almost as a formality. For manufacturing clients today, that order is reversed. Before we schedule a tour, we want to know the existing service, the capacity for growth and how responsive the utility is in that submarket. If those answers are bad, the building is off the list, no matter how well it scores on everything else\u2014especially for power-dense sectors like aerospace, life sciences, EV, robotics and food processing, where the utility itself is often the real bottleneck.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sprinklers get the same scrutiny now, for the same reason. A building&#8217;s existing system may be rated for standard warehousing, but manufacturers often store commodities, materials or rack heights that require something different, and finding that out after signing means a retrofit that can rival power work in both cost and timeline.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That&#8217;s why we treat power and fire protection as core building attributes, evaluated alongside size, loading and clear height, not boxes to check once a deal is already moving. The buildings that can prove out both aren&#8217;t just more convenient, they carry a real premium, because they solve problems that money and time can&#8217;t fix on a lease timeline.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Manufacturing real estate decisions carry a level of complexity that most standard industrial searches don&#8217;t. At Hughes Marino, we represent occupiers of space, not landlords, which means our only interest when evaluating a building is what it will mean for your operation over the life of the lease. Our industrial team works with manufacturing tenants to navigate exactly these challenges, from the initial needs assessment through lease execution.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Alex Musetti, Will Tober and Mike Paleo Finding a compatible industrial space has always been complex. But for manufacturers today, the challenge runs deeper than square footage and location. This is, in part, due to the decades-long trend of sending U.S. manufacturing facilities abroad. The result of that trend was that the U.S. no [&hellip;]<\/p>\n","protected":false},"author":38,"featured_media":32982,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1062],"tags":[],"publication":[],"video_type":[],"coauthors":[1017,1051,1126],"class_list":["post-32978","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hm-blog"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease - Hughes Marino Orange County<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease - Hughes Marino Orange County\" \/>\n<meta property=\"og:description\" content=\"By Alex Musetti, Will Tober and Mike Paleo Finding a compatible industrial space has always been complex. But for manufacturers today, the challenge runs deeper than square footage and location. This is, in part, due to the decades-long trend of sending U.S. manufacturing facilities abroad. The result of that trend was that the U.S. no [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/\" \/>\n<meta property=\"og:site_name\" content=\"Hughes Marino Orange County\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-18T20:45:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-18T20:46:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-featured-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"765\" \/>\n\t<meta property=\"og:image:height\" content=\"420\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Alex Musetti, Will Tober, Mike Paleo\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alex Musetti, Will Tober, Mike Paleo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/\"},\"author\":{\"name\":\"Alex Musetti\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/#\\\/schema\\\/person\\\/7ab195e6f3332dfe221ba8a458a148d4\"},\"headline\":\"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease\",\"datePublished\":\"2026-11-18T20:45:48+00:00\",\"dateModified\":\"2026-11-18T20:46:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/\"},\"wordCount\":2277,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/hidden-challenges-of-manufacturing-space-featured-image.jpg\",\"articleSection\":[\"HM Blog\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/\",\"url\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/\",\"name\":\"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease - Hughes Marino Orange County\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/hidden-challenges-of-manufacturing-space-featured-image.jpg\",\"datePublished\":\"2026-11-18T20:45:48+00:00\",\"dateModified\":\"2026-11-18T20:46:36+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/#primaryimage\",\"url\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/hidden-challenges-of-manufacturing-space-featured-image.jpg\",\"contentUrl\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/hidden-challenges-of-manufacturing-space-featured-image.jpg\",\"width\":765,\"height\":420,\"caption\":\"hidden challenges of manufacturing space featured image\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/2026\\\/11\\\/18\\\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/#website\",\"url\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/\",\"name\":\"Hughes Marino\",\"description\":\"Hughes Marino is an award-winning commercial real estate firm exclusively representing tenants and buyers, never landlords, with zero conflict of interest.\",\"publisher\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/#organization\",\"name\":\"Hughes Marino\",\"url\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/HM-Logo-Inline-Black.png\",\"contentUrl\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/HM-Logo-Inline-Black.png\",\"width\":2369,\"height\":167,\"caption\":\"Hughes Marino\"},\"image\":{\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/#\\\/schema\\\/person\\\/7ab195e6f3332dfe221ba8a458a148d4\",\"name\":\"Alex Musetti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/alex-musetti-1-96x96.jpg751016d4f68cfc88ed4f8df7fac2baca\",\"url\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/alex-musetti-1-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/wp-content\\\/uploads\\\/sites\\\/6\\\/alex-musetti-1-96x96.jpg\",\"caption\":\"Alex Musetti\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/admin\"],\"url\":\"https:\\\/\\\/hughesmarino.com\\\/orange-county\\\/blog\\\/author\\\/amusetti\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease - Hughes Marino Orange County","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/","og_locale":"en_US","og_type":"article","og_title":"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease - Hughes Marino Orange County","og_description":"By Alex Musetti, Will Tober and Mike Paleo Finding a compatible industrial space has always been complex. But for manufacturers today, the challenge runs deeper than square footage and location. This is, in part, due to the decades-long trend of sending U.S. manufacturing facilities abroad. The result of that trend was that the U.S. no [&hellip;]","og_url":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/","og_site_name":"Hughes Marino Orange County","article_published_time":"2026-11-18T20:45:48+00:00","article_modified_time":"2026-11-18T20:46:36+00:00","og_image":[{"width":765,"height":420,"url":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-featured-image.jpg","type":"image\/jpeg"}],"author":"Alex Musetti, Will Tober, Mike Paleo","twitter_misc":{"Written by":"Alex Musetti, Will Tober, Mike Paleo","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/#article","isPartOf":{"@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/"},"author":{"name":"Alex Musetti","@id":"https:\/\/hughesmarino.com\/orange-county\/#\/schema\/person\/7ab195e6f3332dfe221ba8a458a148d4"},"headline":"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease","datePublished":"2026-11-18T20:45:48+00:00","dateModified":"2026-11-18T20:46:36+00:00","mainEntityOfPage":{"@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/"},"wordCount":2277,"commentCount":0,"publisher":{"@id":"https:\/\/hughesmarino.com\/orange-county\/#organization"},"image":{"@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/#primaryimage"},"thumbnailUrl":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-featured-image.jpg","articleSection":["HM Blog"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/","url":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/","name":"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease - Hughes Marino Orange County","isPartOf":{"@id":"https:\/\/hughesmarino.com\/orange-county\/#website"},"primaryImageOfPage":{"@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/#primaryimage"},"image":{"@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/#primaryimage"},"thumbnailUrl":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-featured-image.jpg","datePublished":"2026-11-18T20:45:48+00:00","dateModified":"2026-11-18T20:46:36+00:00","breadcrumb":{"@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/#primaryimage","url":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-featured-image.jpg","contentUrl":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/hidden-challenges-of-manufacturing-space-featured-image.jpg","width":765,"height":420,"caption":"hidden challenges of manufacturing space featured image"},{"@type":"BreadcrumbList","@id":"https:\/\/hughesmarino.com\/orange-county\/blog\/2026\/11\/18\/the-hidden-challenges-of-manufacturing-space-what-to-know-before-you-sign-a-lease\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hughesmarino.com\/orange-county\/"},{"@type":"ListItem","position":2,"name":"The Hidden Challenges of Manufacturing Space: What to Know Before You Sign a Lease"}]},{"@type":"WebSite","@id":"https:\/\/hughesmarino.com\/orange-county\/#website","url":"https:\/\/hughesmarino.com\/orange-county\/","name":"Hughes Marino","description":"Hughes Marino is an award-winning commercial real estate firm exclusively representing tenants and buyers, never landlords, with zero conflict of interest.","publisher":{"@id":"https:\/\/hughesmarino.com\/orange-county\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hughesmarino.com\/orange-county\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/hughesmarino.com\/orange-county\/#organization","name":"Hughes Marino","url":"https:\/\/hughesmarino.com\/orange-county\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hughesmarino.com\/orange-county\/#\/schema\/logo\/image\/","url":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/HM-Logo-Inline-Black.png","contentUrl":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/HM-Logo-Inline-Black.png","width":2369,"height":167,"caption":"Hughes Marino"},"image":{"@id":"https:\/\/hughesmarino.com\/orange-county\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/hughesmarino.com\/orange-county\/#\/schema\/person\/7ab195e6f3332dfe221ba8a458a148d4","name":"Alex Musetti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/alex-musetti-1-96x96.jpg751016d4f68cfc88ed4f8df7fac2baca","url":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/alex-musetti-1-96x96.jpg","contentUrl":"https:\/\/hughesmarino.com\/orange-county\/wp-content\/uploads\/sites\/6\/alex-musetti-1-96x96.jpg","caption":"Alex Musetti"},"sameAs":["https:\/\/x.com\/admin"],"url":"https:\/\/hughesmarino.com\/orange-county\/blog\/author\/amusetti\/"}]}},"_links":{"self":[{"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/posts\/32978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/users\/38"}],"replies":[{"embeddable":true,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/comments?post=32978"}],"version-history":[{"count":4,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/posts\/32978\/revisions"}],"predecessor-version":[{"id":32984,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/posts\/32978\/revisions\/32984"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/media\/32982"}],"wp:attachment":[{"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/media?parent=32978"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/categories?post=32978"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/tags?post=32978"},{"taxonomy":"publication","embeddable":true,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/publication?post=32978"},{"taxonomy":"video_type","embeddable":true,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/video_type?post=32978"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/hughesmarino.com\/orange-county\/wp-json\/wp\/v2\/coauthors?post=32978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}