‹ Back to Portfolio

Description

Located in Torrey Pines, the 10,000 square foot expansion space for the CoStar Group is located on the second floor of the Aventine Building. High-end finishes, corporate design and intricate lighting throughout give this expansion space its own corporate office feel. With the Lutron lighting control system, the perimeter window shades and lights can be set to automatically save energy. Because CoStar relies on the frequent use of video conferencing, Hughes Marino Construction Management (CM), Perkins + Will, Wiedenbach Brown, and Back’s Construction worked together to perfect the technology, A/V components, and conference room aesthetics.

Added Value

From the beginning of the project, Hughes Marino CM worked with the design team in Washington DC to produce a design that would meet local codes. Additionally, Hughes Marino CM ensured the proposed design met CoStar’s internal project budgets. Time was of the essence, as CoStar had numerous employees that needed to be operational by a specific date, so despite a two-week delay in the light fixture package delivery, Hughes Marino CM was able to work with Back’s Construction to complete the project on time and under budget.

Service Provided

Hughes Marino CM provided complete construction management services from design and permitting to selection of the general contractor, project pricing, construction activity management, and coordination of client vendors.

Project Details

Square Feet - 10,000 SF

Contract Amount - Not Disclosed

General Contractor - Back’s Construction

Architect - Perkins + Will

Project Categories

Industry - Technology

Amenities - Dining Area, Kitchen

Project Type - Corporate Office, Tenant Improvement

Entropic Communications
Previous Case Study

Entropic Communications

Family-Health05
Next Case Study

Family Health Centers of San Diego - HITEC Center